Progress of Project

2003

  • Need to repair roof and refurbish interior of St Stephen's recognised.

  • Consultations undertaken with various local and national bodies and with users of the building.

2004

  • Architect's plans for roof and tower and conceptual drawings for interior widely shared. Second set accepted after three rounds of local and national consultations.

  • Archaeological, access, cost survey reports commissioned and received.

 

Project display inside St Stephen's Church

  • Public displays of proposed changes with invitation to comment

  • Application (failed) to English Heritage for Phase 1 (roof/ tower) funding support.

High Street banner

2005

  • Patrons (Lord Mayor/Bishop/MP) accept invitation.

  • Risk analysis undertaken.

  • Application (roof/tower repair) to English Heritage re-submitted (successful).

2006

  • Vehicular access to building agreed.

  • Public fundraising launch; Phase 1 matched funding raised.

  • Design team established; website set up.

  • Permissions to proceed with Phase 1 works obtained.

2007/8

  • Phase 1 works undertaken - scaffold, hoarding, sheeted elevations and roof coverings. Removal and reinstatement of slated and lead roof to building, tower and spire.

  • Roof found to be seriously 'blitz' damaged, tower required strengthening and parapet over the High Street pavement was in a dangerous condition.

  • Roof and tower repairs completed in 2008

2009

  •  'Access for all' policy agreed after wide consultation (inc. focus groups).

  • Preliminary archaeological assessment of crypt undertaken.

  • Removal, restoration and relocation of historic pipe organ undertaken.

  • Staged progression of Phases 2 to 5 discussed and budget estimate agreed.

  • Successful grant application to Viridor Credits Environment Co. (Landfill Community Fund) submitted.

Collecting box displayed daily in High Street

2010

  •  Planning and ecclesiastical permissions to proceed with Phases 2 - 5 obtained.

  • Asbestos, monument care, heating and lighting surveys commissioned.

  • Re-structuring of management team undertaken.

  • Funds to meet estimated cost of Phase 2 and part of Phase 3 obtained.

  • Tender for Phase 2 works with start date in January 2011 accepted.

  • Fundraising continues and reaches a total of £1 million by the year-end.

2011 (to August)

  • Phase 2 (internal & external walls) works commenced in January and completed in May.

  • Additional grant from Viridor Credits makes it possible to commence Phase 3.

  • Phase 3 (internal refurbishment) commenced in June.

  • Removal of contents including Kitchen, Vestry, Tower Room, Porch, Dias, Floor completed.

  • Preparation for internal ramp completed.

  • New stone floor prepared.

  • West End large window revealed.

  • Fund-raising reaches £1.35M - 88% of total sum needed.

>>> also see latest news

>>> next

  This page was last updated on 26 August 2011.